Two guys
on ropes helped to position the cross beams, the guy with the
hat waved and instucted the crane driver while the men at each
end dropped in the bolts to secure. It took about 10 minutes for
the beam to be strapped, lifted, lowered, fixed, unstrapped and
the crane moved and ready for the next beam.
|